Jobs
Discover
Toggle theme
Post a Job
Sign In
Sign Up
Beesla - Collect data about project sites.
Collect data about project sites.
Detailed Work Activity
Element:
Getting Information
Intermediate Activity:
Gather data about operational or development activities.
Occupations with this activity
Architectural and Civil Drafters
(17-3011.00)
Cost Estimators
(13-1051.00)
Electrical and Electronics Drafters
(17-3012.00)
Electrical Engineers
(17-2071.00)
Floor Layers, Except Carpet, Wood, and Hard Tiles
(47-2042.00)
Geoscientists, Except Hydrologists and Geographers
(19-2042.00)
Hydrologists
(19-2043.00)
Radio Frequency Identification Device Specialists
(17-2072.01)
Solar Energy Systems Engineers
(17-2199.11)
Source: O*NET database (dwa_reference, tasks_to_dwas)