Jobs
Discover
Toggle theme
Post a Job
Sign In
Sign Up
Beesla - Estimate time requirements for development or production projects.
Estimate time requirements for development or production projects.
Detailed Work Activity
Element:
Making Decisions and Solving Problems
Intermediate Activity:
Determine resource needs of projects or operations.
Occupations with this activity
Bioengineers and Biomedical Engineers
(17-2031.00)
Human Factors Engineers and Ergonomists
(17-2112.01)
Manufacturing Engineers
(17-2112.03)
Source: O*NET database (dwa_reference, tasks_to_dwas)